In 1999, a suite of three new conditions of contract was published by FIDIC, following the basic structure and wording harmonised and updated around the previous FIDIC Design Build and Turnkey Contract (the 1992 range Book). These conditions, known as the FIDIC rainbow, were the Conditions of C- tract for: l Construction, the so called Red Book, for works designed by the Employer l Plant and De…